Energy and environment
Electricity to 2024 (1445–1446 AH); oil and gas to 2025 (1446–1447 AH); household energy to 2024 (1445–1446 AH).
Electricity in Saudi Arabia year by year
2019 (1440–1441 AH) to 2024 (1445–1446 AH).
| Year | Licensed capacity (GW) | of which renewable (GW) | Peak load (GW) | Consumption (thousand GWh) | Transmission and distribution loss % | Residential use per person (kWh a year) |
|---|---|---|---|---|---|---|
| 2019 | 85.0 | 0.30 | 62.1 | 288.6 | 9.4 | — |
| 2020 | 90.0 | 0.30 | 62.3 | 289.3 | 10.8 | — |
| 2021 | 90.0 | 0.61 | 64.2 | 301.6 | 10.3 | — |
| 2022 | 90.5 | 0.70 | 65.3 | 309.5 | 10.1 | — |
| 2023 | 91.1 | 2.80 | 70.7 | 327.0 | 9.5 | — |
| 2024 | 92.5 | 6.55 | 74.8 | 340.4 | 8.5 | — |
| Licensed capacity by type of generating unit (GW) | 2019 | 2024 |
|---|---|---|
| Steam units | 38.00 | 41.80 |
| Gas units | 29.60 | 29.30 |
| Combined cycle | 16.70 | 17.10 |
| Diesel | 0.40 | 0.20 |
| Renewable energy | 0.30 | 6.55 |
| Total published capacity | 85.0 | 92.5 |
A difference within the source itself: the sum of capacities by unit type as GASTAT published it exceeds the published “total capacity” in most years (by up to 2.6%). We show both as published and do not correct one with the other.
- Public bodies and research offices: See the size and direction of the electricity system: how much capacity grew, how much of it is renewable, and how much is lost in the network.
- A factory or energy-intensive project: Peak load approaches capacity in the summer months; this is general information about the system, not about the availability of power at a particular site.
A description of what the figures say, not advice.
Electricity sold by region and category
How much the electricity companies sold in each administrative region for each consumption category, 2024 (1445–1446 AH), in GWh. The largest industrial consumption is in Eastern Province. GASTAT does not publish licensed capacity or peak load by administrative region; what is published by region is sales for 2024 only.
| Region | Residential | Commercial | Government | Industrial | Other |
|---|---|---|---|---|---|
| Riyadh | 45,213 | 19,429 | 11,279 | 7,387 | 4,179 |
| Makkah | 41,260 | 16,457 | 8,002 | 7,892 | 3,598 |
| Eastern Province | 26,659 | 10,484 | 5,605 | 36,641 | 4,113 |
| Madinah | 10,427 | 3,740 | 2,168 | 8,266 | 3,448 |
| Qassim | 7,145 | 1,868 | 1,876 | 1,044 | 1,196 |
| Asir | 7,478 | 1,795 | 1,880 | 293 | 1,033 |
| Tabuk | 3,641 | 43 | 1,049 | 99 | 447 |
| Hail | 3,399 | 834 | 995 | 282 | 687 |
| Jazan | 7,943 | 1,911 | 2,261 | 1,407 | 356 |
| Najran | 2,345 | 863 | 872 | 28 | 35 |
| Al-Baha | 1,434 | 379 | 388 | 21 | 57 |
| Al-Jouf | 2,547 | 551 | 703 | 41 | 242 |
| Northern Borders | 1,716 | 431 | 442 | 27 | 45 |
| Saudi Arabia (consumption by category) | 161,207 | 58,821 | 37,520 | 63,446 | 19,436 |
The Saudi Arabia row comes from the source’s “consumption by category” table; we checked that the sum of the regions matches it in every category (difference below 0.1%).
| Peak load (GW) | Central | Eastern | Western | Southern | Saudi Arabia |
|---|---|---|---|---|---|
| 2020 | 19.8 | 19.0 | 15.8 | 6.4 | 62.3 |
| 2021 | 20.0 | 19.2 | 16.4 | 6.6 | 64.2 |
| 2022 | 21.1 | 19.9 | 16.4 | 7.0 | 65.3 |
| 2023 | 22.4 | 20.9 | 18.3 | 7.6 | 70.7 |
| 2024 | 24.7 | 22.1 | 19.3 | 8.2 | 74.8 |
The four “operating areas” are the divisions of the electricity grid, not the 13 administrative regions. Regional peaks do not occur at the same hour, so their sum does not equal the national peak.
- An electrical supplier or maintenance contractor: See where commercial and industrial consumption concentrates.
- Someone studying a region for a new activity: Read residential consumption as a rough size of the homes there. The figures are totals for a whole region, not a city or district.
Energy in the home by region
From GASTAT’s household energy survey, 2024 (1445–1446 AH) (% of homes or households): homes with thermal insulation, homes using cooking gas or kerosene, households that would like solar energy for their home or care a lot about saving electricity, and residential consumption. The highest insulation rate is in Najran and the lowest in Asir.
| Region | Thermal insulation: yes % | Thermal insulation: don’t know % | Use cooking gas % | Use kerosene % | Would like solar energy % | Very interested in saving % | Residential consumption (GWh) |
|---|---|---|---|---|---|---|---|
| Saudi Arabia | 45.8 | 29.8 | 86.6 | 1.1 | 40.8 | 91.5 | 161,207 |
| Riyadh | 43.1 | 39.0 | 88.0 | 0.7 | 43.3 | 93.5 | 45,213 |
| Makkah | 47.3 | 28.5 | 90.9 | 0.2 | 40.7 | 89.7 | 41,260 |
| Eastern Province | 53.3 | 30.6 | 65.2 | 1.9 | 32.9 | 91.8 | 26,659 |
| Madinah | 49.9 | 27.2 | 91.1 | 0.5 | 21.9 | 92.9 | 10,427 |
| Qassim | 54.7 | 18.2 | 97.3 | 0.4 | 33.4 | 89.7 | 7,145 |
| Asir | 29.3 | 25.9 | 91.4 | 0.5 | 59.0 | 85.1 | 7,478 |
| Tabuk | 41.5 | 35.8 | 89.9 | 0.2 | 28.7 | 89.8 | 3,641 |
| Hail | 39.5 | 13.4 | 89.2 | 2.1 | 37.9 | 82.0 | 3,399 |
| Jazan | 37.6 | 14.2 | 98.6 | 0.9 | 66.1 | 97.3 | 7,943 |
| Najran | 58.9 | 10.9 | 92.4 | 0.1 | 70.2 | 99.9 | 2,345 |
| Al-Baha | 40.1 | 21.5 | 88.9 | 0.3 | 57.4 | 92.5 | 1,434 |
| Al-Jouf | 35.7 | 21.4 | 96.9 | 23.8 | 36.6 | 97.0 | 2,547 |
| Northern Borders | 48.8 | 13.0 | 92.5 | 2.9 | 31.6 | 93.2 | 1,716 |
“Don’t know” is large: about a quarter of households or more do not know whether their home is insulated, so the “yes” share is a minimum, not the number of insulated homes. The figure is a sample estimate, and small differences between regions are inconclusive.
- An insulation supplier or solar panel installer: See in each region the share of homes without insulation, and the share of households that say they would like solar energy; a wish stated in a survey is not confirmed demand or sales.
- A gas or kerosene distributor: See how much each region relies on it.
The previous survey (households)
The same survey before its update, with different questions and categories: the shares here are our calculation on the household counts GASTAT published, and Saudi Arabia is the sum of the regions. Do not join these columns to the table above. Survey years: 2021 (1442–1443 AH) and 2022 (1443–1444 AH).
| Region | Electricity from the public grid % (2022) | Use cooking gas % (2022) | Use kerosene % (2022) | Use solar energy % (2021) | Use energy-saving devices % (2021) | Home has thermal insulation % (2021) |
|---|---|---|---|---|---|---|
| Saudi Arabia | 98.4 | 89.9 | 2.4 | 2.0 | 63.9 | 25.5 |
| Riyadh | 98.9 | 90.3 | 2.4 | 3.3 | 72.9 | 36.3 |
| Makkah | 98.5 | 91.4 | 0.2 | 2.5 | 70.0 | 25.2 |
| Eastern Province | 97.5 | 72.3 | 2.1 | 1.0 | 70.4 | 28.7 |
| Madinah | 96.1 | 90.1 | 0.3 | 1.5 | 48.1 | 17.4 |
| Qassim | 97.6 | 96.2 | 3.1 | 0.8 | 42.5 | 15.4 |
| Asir | 99.4 | 97.3 | 1.9 | 1.0 | 40.2 | 23.2 |
| Tabuk | 96.5 | 96.5 | 2.6 | 0.6 | 64.9 | 16.6 |
| Hail | 99.0 | 97.2 | 12.5 | 0.6 | 71.7 | 13.3 |
| Jazan | 99.2 | 97.8 | 1.9 | 0.5 | 35.6 | 13.9 |
| Najran | 99.0 | 98.0 | 0.7 | 1.2 | 54.2 | 16.6 |
| Al-Baha | 99.7 | 95.3 | 0.6 | 0.8 | 67.2 | 5.2 |
| Al-Jouf | 99.5 | 98.7 | 35.3 | 2.2 | 69.2 | 10.0 |
| Northern Borders | 98.8 | 97.0 | 24.7 | 2.5 | 47.5 | 7.1 |
Main source of drinking water at home
Household environment survey, 2024 (1445–1446 AH), % of homes: where households in each region get their drinking water — the public network, bottled water or water tankers. The highest share for the public network is in Hail, and the highest share for bottled water in Jazan.
| Region | Distribution | Public network % | Bottled water % | Water tankers % | Other % |
|---|---|---|---|---|---|
| Saudi Arabia | 36.5 | 47.3 | 15.8 | 0.3 | |
| Riyadh | 45.9 | 48.2 | 5.6 | 0.3 | |
| Makkah | 30.6 | 42.3 | 26.9 | 0.2 | |
| Eastern Province | 30.2 | 61.7 | 7.9 | 0.2 | |
| Madinah | 45.0 | 44.6 | 9.7 | 0.7 | |
| Qassim | 51.8 | 26.4 | 21.5 | 0.3 | |
| Asir | 25.8 | 39.8 | 33.2 | 1.3 | |
| Tabuk | 47.2 | 48.0 | 4.4 | 0.5 | |
| Hail | 71.6 | 5.8 | 22.2 | 0.4 | |
| Jazan | 1.7 | 92.2 | 6.1 | 0.1 | |
| Najran | 17.7 | 47.3 | 34.8 | 0.2 | |
| Al-Baha | 24.1 | 74.4 | 1.2 | 0.4 | |
| Al-Jouf | 41.4 | 9.3 | 49.3 | 0.1 | |
| Northern Borders | 59.8 | 6.1 | 34.0 | 0.0 |
| Saudi Arabia | Public network % | Bottled water % | Water tankers % | Other % |
|---|---|---|---|---|
| 2022 | 28.7 | 49.1 | 21.7 | 0.6 |
| 2023 | 23.6 | 57.2 | 18.6 | 0.6 |
| 2024 | 36.5 | 47.3 | 15.8 | 0.3 |
The series is not read as a trend: the public network’s share in Riyadh Region was 30.7% in 2022 and became 45.9% in 2024, and the answer categories changed after 2021 (they used to include “filters” and “home well”). The jump is more likely a change in the question or classification at the source than a change in the water itself; so we show the latest year by region, and Saudi Arabia for the years GASTAT published it.
Drinking water services themselves are almost universal: the population using safely managed drinking water services is 99.9% in Saudi Arabia (2024), 100.0% in urban and 98.9% in rural areas. The “main source” here is what a household chooses to drink, not network availability.
- A bottled water distributor or a filter and desalination shop: See in each region how many households rely on bottled water or tankers as their main drinking source. This is a share of homes, not volume in litres or spending.
Oil and gas year by year
2010 (1431–1432 AH) to 2025 (1446–1447 AH), million barrels: crude oil production, exports and consumption in Saudi Arabia, natural gas, refinery capacity and reserves. Production was highest in 2022.
| Year | Crude oil production | Crude oil exports | Crude oil consumption | Refinery intake | Natural gas production (billion cubic feet) | Refinery capacity (million barrels a day) | Oil reserves (billion barrels) | Gas reserves (billion cubic metres) |
|---|---|---|---|---|---|---|---|---|
| 2025 | 3,461.8 | 2,347.3 | 155.4 | 1,003.7 | 3,933.0 | 3.35 | 267.2 | 9,786 |
| 2024 | 3,277.5 | 2,214.0 | 166.5 | 948.1 | 3,604.0 | 3.29 | 267.2 | 9,727 |
| 2023 | 3,506.3 | 2,430.7 | 172.6 | 917.7 | 3,645.3 | 3.29 | 267.2 | 9,651 |
| 2022 | 3,865.7 | 2,687.7 | 177.7 | 986.4 | 3,394.5 | 3.29 | 267.2 | 9,514 |
| 2021 | 3,330.5 | 2,273.0 | 159.6 | 903.3 | 3,285.7 | 3.33 | 267.2 | 8,507 |
| 2020 | 3,372.0 | 2,437.1 | 154.5 | 795.7 | 3,266.9 | 2.93 | 267.1 | 8,437 |
| 2019 | 3,580.0 | 2,568.9 | 155.2 | 906.1 | 3,238.6 | 2.90 | 267.1 | 8,366 |
| 2018 | 3,765.8 | 2,690.6 | 149.7 | 965.1 | 3,231.7 | 2.86 | 267.0 | 8,260 |
| 2017 | 3,635.1 | 2,543.5 | 167.4 | 948.8 | 3,143.4 | 2.86 | 266.3 | 8,715 |
| 2016 | 3,828.5 | 2,798.8 | 182.4 | 900.0 | 3,021.0 | 2.86 | 266.2 | 8,619 |
| 2015 | 3,720.3 | 2,698.1 | 209.4 | 796.0 | 2,862.3 | 2.86 | 266.5 | 8,588 |
| 2014 | 3,545.2 | 2,591.8 | 202.4 | 730.1 | 2,839.0 | 2.86 | 266.6 | 8,489 |
| 2013 | 3,517.6 | 2,753.0 | 176.9 | 576.3 | 2,730.2 | 2.42 | 265.8 | 8,317 |
| 2012 | 3,573.4 | 2,711.9 | 193.5 | 632.0 | 2,673.3 | 2.02 | 265.9 | 8,235 |
| 2011 | 3,398.6 | 2,571.5 | 190.8 | 666.1 | 2,456.8 | 2.02 | 265.4 | 8,151 |
| 2010 | 2,980.4 | 2,115.0 | 192.8 | 636.4 | 2,341.8 | 2.02 | 264.5 | 8,016 |
| Refined products (million barrels) | Production 2010 | Production 2025 | Consumption 2010 | Consumption 2025 | Exports 2025 |
|---|---|---|---|---|---|
| Gasoline | 105.2 | 242.0 | 154.0 | 193.5 | 110.5 |
| Diesel (gas oil) | 181.5 | 432.2 | 224.7 | 216.5 | 247.3 |
| Kerosene and jet fuel | 30.7 | 75.2 | 23.6 | 39.6 | 40.7 |
| Fuel oil | 111.5 | 166.8 | 84.1 | 207.2 | 75.7 |
| Liquefied petroleum gases | 10.6 | 11.9 | 13.4 | 29.0 | — |
- Transport and logistics companies: See the size and direction of diesel and gasoline consumption in Saudi Arabia. The figures are for the whole country; the months are in the open file.
Energy efficiency year by year
2020 (1441–1442 AH) to 2024 (1445–1446 AH), Saudi Arabia: how much energy is used per million riyals of output, what efficiency initiatives saved, per-person use of electricity and gasoline, insulated homes, and households’ interest in saving.
| Year | Energy intensity (barrels of oil equivalent per million SAR) | Savings from initiatives (thousand boe a day) | Emissions avoided by initiatives (million tonnes) | Electricity per person (kWh) | Gasoline per person (litres) | Homes with thermal insulation % | Households very interested in saving % |
|---|---|---|---|---|---|---|---|
| 2024 | 393 | 662 | 80 | 9,644 | 838 | 45.8 | 91.5 |
| 2023 | 390 | 539 | 65 | 9,703 | 863 | 38.9 | 92.1 |
| 2022 | 387 | 492 | 57 | 9,620 | 892 | 37.8 | 91.9 |
| 2021 | 412 | 425 | 51 | 9,796 | 889 | 25.5 | 66.1 |
| 2020 | 437 | 357 | 48 | — | — | 29.5 | 62.1 |
The savings include the utilities sector from 2023 only, so the earlier totals are smaller by definition. The share answering “don’t know” in the survey questions (insulation, interest) changed a lot between years, so small differences are not read as a trend.
Renewable energy: operating projects
2019 (1440–1441 AH) to 2025 (1446–1447 AH), megawatts: the capacity of solar and wind projects that had started operating by the end of each year, then each project by region and start year.
| Year | Operating capacity (MW) | Projects |
|---|---|---|
| 2025 | 12,313 | 15 |
| 2024 | 6,551 | 10 |
| 2023 | 3,400 | 6 |
| 2022 | 700 | 2 |
| 2021 | 700 | 2 |
| 2020 | 300 | 1 |
| 2019 | 300 | 1 |
| Project | Region | Type | Capacity (MW) | Homes it can supply (thousand) |
|---|---|---|---|---|
| Sakakah operating since 2019 | Al-Jouf | Solar | 300 | 54.8 |
| Domat Al Jandal operating since 2021 | Al-Jouf | Wind | 400 | 93.4 |
| Al Shuaiba 1 operating since 2023 | Makkah | Solar | 600 | 102.0 |
| Jeddah operating since 2023 | Makkah | Solar | 300 | 54.9 |
| Rabigh 1 operating since 2023 | Makkah | Solar | 300 | 52.7 |
| Sudair operating since 2023 | Riyadh | Solar | 1,500 | 262.8 |
| Al Rass 1 operating since 2024 | Qassim | Solar | 700 | 110.2 |
| Al Shuaiba 2 operating since 2024 | Makkah | Solar | 2,060 | 350.0 |
| Layla operating since 2024 | Riyadh | Solar | 91 | 14.0 |
| Saad 1 operating since 2024 | Riyadh | Solar | 300 | 46.0 |
| Al Henakiyah 1 operating since 2025 | Madinah | Solar | 1,100 | 190.0 |
| Al Kahfah operating since 2025 | Hail | Solar | 1,425 | 244.0 |
| Ar Rass 2 operating since 2025 | Qassim | Solar | 2,000 | 314.0 |
| Saad 2 operating since 2025 | Riyadh | Solar | 1,125 | 175.5 |
| Wadi Al Dawasir operating since 2025 | Riyadh | Solar | 112 | 15.5 |
The total is published for 2024 and 2025; earlier years are our calculation on the project list. The start year of two projects differs between GASTAT’s two editions; we use the latest.
Announced fuel prices
The price of a litre of gasoline, diesel, kerosene and LPG as Saudi Aramco announced it at each revision (SAR per litre, one price for all of Saudi Arabia). Gasoline was revised monthly until its ceiling was fixed on 10 July 2021 (30 Dhu al-Qa'dah 1442 AH); diesel is revised on 1 January each year since 2022 (1443–1444 AH); kerosene and LPG in mid-year. GASTAT’s average-price table does not include these products, so their source here is the official announcements.
| Product | Latest announced price (SAR/litre) | Oldest announced price we found | Change since the oldest price % |
|---|---|---|---|
| Gasoline 91 | 2.18 1 September 2026 (19 Rabi' al-Awwal 1448 AH) | 1.81 11 February 2021 (29 Jumada al-Akhirah 1442 AH) | +20.4% |
| Gasoline 95 | 2.33 1 September 2026 (19 Rabi' al-Awwal 1448 AH) | 1.94 11 February 2021 (29 Jumada al-Akhirah 1442 AH) | +20.1% |
| Diesel | 1.79 1 September 2026 (19 Rabi' al-Awwal 1448 AH) | 0.63 1 January 2022 (28 Jumada al-Ula 1443 AH) | +184.1% |
| Kerosene | 1.75 1 September 2026 (19 Rabi' al-Awwal 1448 AH) | 0.81 11 June 2022 (12 Dhu al-Qa'dah 1443 AH) | +116.0% |
| Liquefied petroleum gas (LPG) | 1.09 1 July 2025 (6 Muharram 1447 AH) | 0.90 11 June 2022 (12 Dhu al-Qa'dah 1443 AH) | +21.1% |
All revisions and the source of each price (30; mostly Arabic news reports)
| Product and date | SAR/litre | Date basis and source |
|---|---|---|
| Gasoline 91 11 February 2021 (29 Jumada al-Akhirah 1442 AH) | 1.81 | Monthly revision (applied on the 11th) · سي إن إن بالعربية |
| Gasoline 95 11 February 2021 (29 Jumada al-Akhirah 1442 AH) | 1.94 | Monthly revision (applied on the 11th) · سي إن إن بالعربية |
| Gasoline 91 11 March 2021 (27 Rajab 1442 AH) | 1.90 | Monthly revision (applied on the 11th) · سي إن إن بالعربية |
| Gasoline 95 11 March 2021 (27 Rajab 1442 AH) | 2.04 | Monthly revision (applied on the 11th) · سي إن إن بالعربية |
| Gasoline 91 11 April 2021 (29 Sha'ban 1442 AH) | 1.99 | Monthly revision (applied on the 11th) · عاجل |
| Gasoline 95 11 April 2021 (29 Sha'ban 1442 AH) | 2.13 | Monthly revision (applied on the 11th) · عاجل |
| Gasoline 91 11 May 2021 (29 Ramadan 1442 AH) | 2.08 | Monthly revision (applied on the 11th) · عاجل |
| Gasoline 95 11 May 2021 (29 Ramadan 1442 AH) | 2.23 | Monthly revision (applied on the 11th) · عاجل |
| Gasoline 91 11 June 2021 (1 Dhu al-Qa'dah 1442 AH) | 2.18 | Announced effective date · عاجل |
| Gasoline 95 11 June 2021 (1 Dhu al-Qa'dah 1442 AH) | 2.33 | Announced effective date · عاجل |
| Gasoline 91 10 July 2021 (30 Dhu al-Qa'dah 1442 AH) | 2.18 | Price ceiling fixed · وكالة الأنباء السعودية (واس) |
| Gasoline 95 10 July 2021 (30 Dhu al-Qa'dah 1442 AH) | 2.33 | Price ceiling fixed · وكالة الأنباء السعودية (واس) |
| Diesel 1 January 2022 (28 Jumada al-Ula 1443 AH) | 0.63 | Annual revision (1 January) · AGBI |
| Kerosene 11 June 2022 (12 Dhu al-Qa'dah 1443 AH) | 0.81 | Announced effective date · أرقام |
| Liquefied petroleum gas (LPG) 11 June 2022 (12 Dhu al-Qa'dah 1443 AH) | 0.90 | Announced effective date · أرقام |
| Diesel 1 January 2023 (8 Jumada al-Akhirah 1444 AH) | 0.75 | Annual revision (1 January) · AGBI |
| Kerosene 11 June 2023 (22 Dhu al-Qa'dah 1444 AH) | 0.93 | Announcement date · الوسط |
| Liquefied petroleum gas (LPG) 11 June 2023 (22 Dhu al-Qa'dah 1444 AH) | 0.95 | Announcement date · الوسط |
| Diesel 1 January 2024 (19 Jumada al-Akhirah 1445 AH) | 1.15 | Annual revision (1 January) · إرم بزنس |
| Kerosene 30 June 2024 (24 Dhu al-Hijjah 1445 AH) | 1.33 | Announcement date · الاقتصادية |
| Liquefied petroleum gas (LPG) 30 June 2024 (24 Dhu al-Hijjah 1445 AH) | 1.04 | Announcement date · الاقتصادية |
| Diesel 1 January 2025 (1 Rajab 1446 AH) | 1.66 | Announced effective date · إرم بزنس |
| Kerosene 1 July 2025 (6 Muharram 1447 AH) | 1.59 | Announcement date · أرقام |
| Liquefied petroleum gas (LPG) 1 July 2025 (6 Muharram 1447 AH) | 1.09 | Announcement date · أرقام |
| Diesel 1 January 2026 (12 Rajab 1447 AH) | 1.79 | Announced effective date · العين الإخبارية |
| Kerosene 1 July 2026 (16 Muharram 1448 AH) | 1.75 | Aramco monthly list · ArabWheels |
| Gasoline 91 1 September 2026 (19 Rabi' al-Awwal 1448 AH) | 2.18 | Current official page · أرامكو السعودية |
| Gasoline 95 1 September 2026 (19 Rabi' al-Awwal 1448 AH) | 2.33 | Current official page · أرامكو السعودية |
| Diesel 1 September 2026 (19 Rabi' al-Awwal 1448 AH) | 1.79 | Current official page · أرامكو السعودية |
| Kerosene 1 September 2026 (19 Rabi' al-Awwal 1448 AH) | 1.75 | Current official page · أرامكو السعودية |
- A transport fleet or equipment owner: A litre of diesel changed +184.1% between 1 January 2022 (28 Jumada al-Ula 1443 AH) and 1 September 2026 (19 Rabi' al-Awwal 1448 AH), and it is revised on 1 January each year, so operating costs are calculated on the announced price, not an old one.
- A restaurant or bakery: See the path of the price of a litre of LPG (+21.1% since 11 June 2022 · 12 Dhu al-Qa'dah 1443 AH).
- A household: The price of gasoline has been fixed at its ceiling since 10 July 2021 (30 Dhu al-Qa'dah 1442 AH). These are announced national prices, not what you pay at a particular station, and not a forecast of the next revision.
- We do not know consumption, insulation or water source by city or district; the finest level is the administrative region, and Riyadh Region, for example, is wider than Riyadh city and includes its governorates and villages.
- We do not know any household’s bill or the electricity tariff, nor licensed capacity by administrative region (GASTAT does not publish it).
- The previous household energy survey is old (2022 at the latest), and the new survey covers two years only (2023 and 2024), so we do not draw a trend from them. The figures are sample estimates, and we do not forecast coming years.
- Household electricity use from the previous survey (winter and the rest of the year) is in the open file but not shown here: its unit is not stated in GASTAT’s table, and its total is about a fifth higher than electricity sold to residential customers.
- The shares in “the previous survey” are our calculation (households using ÷ all households); the other figures are as GASTAT published them.[1]
The attribution statement in Arabic (the Arabic text governs; the English above is a summary)
المصدر: الهيئة العامة للإحصاء — إحصاءات الكهرباء، وإحصاءات البترول والغاز، وإحصاءات كفاءة الطاقة (مصدرها عند الهيئة وزارة الطاقة والمركز السعودي لكفاءة الطاقة)، وإحصاءات الطاقة المتجددة، ومسح الطاقة المنزلية، ومسح البيئة المنزلية. التنظيم والحساب من «نبض البيانات»، وليس إحصاءً رسميًا ولا تزكية من الهيئة.
GASTAT statistical database: electricity (DSD_EL_EAE_V_MV) · household energy (DPV_HES_EHE_IT_HES0201, DPV_HES_EHE_IT_HES0301, DPV_HES_EHE_IT_HES0303, DPV_HES_EHE_IT_HES0501, DPV_HES_EHE_IT_HES0602, DPV_HES_EHE_IT_HES0605, DSD_HES_EAE_V_MV) · household environment (DSD_HE_EAE_V_MV) · oil and gas (DSD_OG_EAE_V_MV) · energy efficiency (DSD_EF_EAE_V_MV) · renewable energy (DSD_RE_EAE_V_MV)[2]
Files: gastat-electricity-annual.csv · gastat-household-energy-region.csv · gastat-drinking-water-region.csv · gastat-oil-gas-monthly.csv · gastat-energy-efficiency.csv · gastat-renewable-projects.csv · Hijri dates use the Umm al-Qura calendar.
Electricity in Saudi Arabia
How much electricity does a household use per year?
18,590 kWh per year
2024 (1445–1446 AH) · household average, all households · General Authority for Statistics (GASTAT)
How many electricity customers are there in Saudi Arabia?
11,336,215 customers
2024 (1445–1446 AH) · General Authority for Statistics (GASTAT)
How much electricity does Saudi Arabia use per year?
340,430 GWh
2024 (1445–1446 AH) · per year · General Authority for Statistics (GASTAT)
What was the peak electricity load in Saudi Arabia?
74.8 GW
2024 (1445–1446 AH) · General Authority for Statistics (GASTAT)
What is Saudi Arabia’s renewable power capacity?
6.55 GW
2024 (1445–1446 AH) · General Authority for Statistics (GASTAT)
How much household electricity does each person use?
4,567 kWh
2024 (1445–1446 AH) · per year · General Authority for Statistics (GASTAT)
Oil and gas
How much oil does Saudi Arabia produce?
3.46 billion barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much oil does Saudi Arabia export?
2.35 billion barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How large are Saudi Arabia’s oil reserves?
267.20 billion barrels
2025 (1446–1447 AH) · General Authority for Statistics (GASTAT)
How large are Saudi Arabia’s natural gas reserves?
9.79 trillion m³
2025 (1446–1447 AH) · General Authority for Statistics (GASTAT)
What is Saudi Arabia’s oil refining capacity?
3,352,000 barrels per day
2025 (1446–1447 AH) · General Authority for Statistics (GASTAT)
How much gasoline does Saudi Arabia consume?
193.5 million barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
Energy at home
What share of homes use cooking gas?
86.6%
2024 (1445–1446 AH) · of dwellings · General Authority for Statistics (GASTAT)
What share of homes have thermal insulation?
45.8%
2024 (1445–1446 AH) · of dwellings · General Authority for Statistics (GASTAT)
Drinking water at home
What share of homes drink mainly from bottled water?
47.3%
2024 (1445–1446 AH) · main drinking-water source of the dwelling · General Authority for Statistics (GASTAT)
What share of homes drink mainly from the public water network?
36.5%
2024 (1445–1446 AH) · main drinking-water source of the dwelling · General Authority for Statistics (GASTAT)
What share of homes drink mainly from water from tankers?
15.8%
2024 (1445–1446 AH) · main drinking-water source of the dwelling · General Authority for Statistics (GASTAT)
Solar and wind projects
What is the capacity of operating solar and wind projects in Saudi Arabia?
12,313 MW
2025 (1446–1447 AH) · cumulative to year end · General Authority for Statistics (GASTAT)
What is the capacity of the Sudair solar plant?
1,500 MW
2025 (1446–1447 AH) · operating since 2023 · General Authority for Statistics (GASTAT)
What is the capacity of the Al-Shuaibah 2 solar plant?
2,060 MW
2025 (1446–1447 AH) · operating since 2024 · General Authority for Statistics (GASTAT)
What is the capacity of the Al-Rass 2 solar plant?
2,000 MW
2025 (1446–1447 AH) · operating since 2025 · General Authority for Statistics (GASTAT)
What is the capacity of the Al-Kahfah solar plant?
1,425 MW
2025 (1446–1447 AH) · operating since 2025 · General Authority for Statistics (GASTAT)
What is the capacity of the Saad 2 solar plant?
1,125 MW
2025 (1446–1447 AH) · operating since 2025 · General Authority for Statistics (GASTAT)
What is the capacity of the Al-Henakiyah 1 solar plant?
1,100 MW
2025 (1446–1447 AH) · operating since 2025 · General Authority for Statistics (GASTAT)
What is the capacity of the Al-Rass 1 solar plant?
700 MW
2025 (1446–1447 AH) · operating since 2024 · General Authority for Statistics (GASTAT)
What is the capacity of the Al-Shuaibah 1 solar plant?
600 MW
2025 (1446–1447 AH) · operating since 2023 · General Authority for Statistics (GASTAT)
What is the capacity of the Dumat Al-Jandal wind plant?
400 MW
2025 (1446–1447 AH) · operating since 2021 · General Authority for Statistics (GASTAT)
What is the capacity of the Sakaka solar plant?
300 MW
2025 (1446–1447 AH) · operating since 2019 · General Authority for Statistics (GASTAT)
What is the capacity of the Saad 1 solar plant?
300 MW
2025 (1446–1447 AH) · operating since 2024 · General Authority for Statistics (GASTAT)
What is the capacity of the Jeddah solar plant?
300 MW
2025 (1446–1447 AH) · operating since 2023 · General Authority for Statistics (GASTAT)
What is the capacity of the Rabigh 1 solar plant?
300 MW
2025 (1446–1447 AH) · operating since 2023 · General Authority for Statistics (GASTAT)
What is the capacity of the Wadi Al-Dawasir solar plant?
112 MW
2025 (1446–1447 AH) · operating since 2025 · General Authority for Statistics (GASTAT)
What is the capacity of the Layla solar plant?
91 MW
2025 (1446–1447 AH) · operating since 2024 · General Authority for Statistics (GASTAT)
How many homes can the Sudair plant supply?
262,800 homes
2025 (1446–1447 AH) · estimate · General Authority for Statistics (GASTAT)
How many homes can the Al-Shuaibah 2 plant supply?
350,000 homes
2025 (1446–1447 AH) · estimate · General Authority for Statistics (GASTAT)
How many homes can the Al-Rass 2 plant supply?
314,000 homes
2025 (1446–1447 AH) · estimate · General Authority for Statistics (GASTAT)
How many homes can the Al-Kahfah plant supply?
244,000 homes
2025 (1446–1447 AH) · estimate · General Authority for Statistics (GASTAT)
How many homes can the Saad 2 plant supply?
175,500 homes
2025 (1446–1447 AH) · estimate · General Authority for Statistics (GASTAT)
How many homes can the Al-Henakiyah 1 plant supply?
190,000 homes
2025 (1446–1447 AH) · estimate · General Authority for Statistics (GASTAT)
Energy use per person and per customer
How much electricity does one person use in Saudi Arabia?
9,644 kWh
2024 (1445–1446 AH) · per person per year, all sectors · GASTAT and the Ministry of Energy
How many litres of petrol does one person use in Saudi Arabia?
838 litres
2024 (1445–1446 AH) · per person per year · GASTAT and the Ministry of Energy
How much LPG (cooking gas) does one person use in Saudi Arabia?
89 litres
2024 (1445–1446 AH) · per person per year · GASTAT and the Ministry of Energy
How much electricity does a commercial customer use per year?
34.0 MWh
2024 (1445–1446 AH) · per customer per year · GASTAT and the Ministry of Energy
How much electricity does a government customer use per year?
129.3 MWh
2024 (1445–1446 AH) · per customer per year · GASTAT and the Ministry of Energy
How much electricity does an industrial customer use per year?
4,149.2 MWh
2024 (1445–1446 AH) · per customer per year · GASTAT and the Ministry of Energy
What share of households apply electricity-saving practices at home?
91.9%
2024 (1445–1446 AH) · of households · General Authority for Statistics (GASTAT)
Oil and gas: production, exports and use
How much natural gas does Saudi Arabia produce?
3.93 trillion cubic feet
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much natural gas does Saudi Arabia consume?
3.73 trillion cubic feet
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much crude oil do Saudi refineries process per year?
1,003.7 million barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much crude oil does Saudi Arabia use at home?
155.4 million barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much crude oil does Saudi Arabia import?
50.5 million barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much diesel does Saudi Arabia produce?
432.2 million barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much diesel does Saudi Arabia consume?
216.5 million barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much diesel does Saudi Arabia export?
247.3 million barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much gasoline does Saudi Arabia produce?
242.0 million barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much gasoline does Saudi Arabia export?
110.5 million barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much gasoline does Saudi Arabia import?
36.7 million barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much jet fuel and kerosene does Saudi Arabia produce?
75.2 million barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much jet fuel and kerosene does Saudi Arabia consume?
39.6 million barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much jet fuel and kerosene does Saudi Arabia export?
40.7 million barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much fuel oil does Saudi Arabia produce?
166.8 million barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much fuel oil does Saudi Arabia consume?
207.2 million barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much fuel oil does Saudi Arabia export?
75.7 million barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much fuel oil does Saudi Arabia import?
72.9 million barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much liquefied petroleum gas (LPG) does Saudi Arabia produce?
11.9 million barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much liquefied petroleum gas (LPG) does Saudi Arabia consume?
29.0 million barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much naphtha does Saudi Arabia export?
37.7 million barrels
2025 (1446–1447 AH) · per year · General Authority for Statistics (GASTAT)
How much oil did Saudi Arabia produce in 2024?
3.28 billion barrels
2024 (1445–1446 AH) · per year · General Authority for Statistics (GASTAT)
How much oil did Saudi Arabia export in 2024?
2.21 billion barrels
2024 (1445–1446 AH) · per year · General Authority for Statistics (GASTAT)
How much oil does Saudi Arabia produce in a month?
312.6 million barrels
December 2025 (Jumada al-Akhirah – Rajab 1447 AH) · per month · General Authority for Statistics (GASTAT)
How much oil does Saudi Arabia export in a month?
216.6 million barrels
December 2025 (Jumada al-Akhirah – Rajab 1447 AH) · per month · General Authority for Statistics (GASTAT)
Electricity: use, capacity and grids
How much electricity does the residential sector use in Saudi Arabia?
161,207 GWh
2024 (1445–1446 AH) · per year · General Authority for Statistics (GASTAT)
How much electricity does the commercial sector use in Saudi Arabia?
58,821 GWh
2024 (1445–1446 AH) · per year · General Authority for Statistics (GASTAT)
How much electricity does the industrial sector use in Saudi Arabia?
63,446 GWh
2024 (1445–1446 AH) · per year · General Authority for Statistics (GASTAT)
How much electricity does the government sector use in Saudi Arabia?
37,520 GWh
2024 (1445–1446 AH) · per year · General Authority for Statistics (GASTAT)
How much electricity do other sectors use in Saudi Arabia?
19,436 GWh
2024 (1445–1446 AH) · per year · General Authority for Statistics (GASTAT)
What is Saudi Arabia’s licensed power generation capacity?
92.5 GW
2024 (1445–1446 AH) · all plant types · General Authority for Statistics (GASTAT)
What is the capacity of steam plants in Saudi Arabia?
41.8 GW
2024 (1445–1446 AH) · licensed capacity · General Authority for Statistics (GASTAT)
What is the capacity of gas turbine plants in Saudi Arabia?
29.3 GW
2024 (1445–1446 AH) · licensed capacity · General Authority for Statistics (GASTAT)
What is the capacity of combined-cycle plants in Saudi Arabia?
17.1 GW
2024 (1445–1446 AH) · licensed capacity · General Authority for Statistics (GASTAT)
What is the capacity of diesel plants in Saudi Arabia?
0.2 GW
2024 (1445–1446 AH) · licensed capacity · General Authority for Statistics (GASTAT)
What share of electricity is lost in Saudi Arabia’s grid?
8.51%
2024 (1445–1446 AH) · grid losses · General Authority for Statistics (GASTAT)
How much electricity is sent to the grid in Saudi Arabia per year?
402,628 GWh
2024 (1445–1446 AH) · per year · General Authority for Statistics (GASTAT)
What was the peak load on the Central electricity grid?
24.7 GW
2024 (1445–1446 AH) · annual peak · General Authority for Statistics (GASTAT)
What was the peak load on the Eastern electricity grid?
22.1 GW
2024 (1445–1446 AH) · annual peak · General Authority for Statistics (GASTAT)
What was the peak load on the Western electricity grid?
19.3 GW
2024 (1445–1446 AH) · annual peak · General Authority for Statistics (GASTAT)
What was the peak load on the Southern electricity grid?
8.2 GW
2024 (1445–1446 AH) · annual peak · General Authority for Statistics (GASTAT)
How much electricity does a residential meter use per year?
17,595 kWh
2024 (1445–1446 AH) · per year, per residential customer · General Authority for Statistics (GASTAT)
Electricity by region
How much electricity do homes use in each region?
| Saudi Arabia | 161,207 GWh |
|---|---|
| Riyadh Region | 45,213 GWh |
| Makkah Region | 41,260 GWh |
| Madinah Region | 10,427 GWh |
| Eastern Province | 26,659 GWh |
| Qassim Region | 7,145 GWh |
| Asir Region | 7,478 GWh |
| Tabuk Region | 3,641 GWh |
| Hail Region | 3,399 GWh |
| Jazan Region | 7,943 GWh |
| Najran Region | 2,345 GWh |
| Al-Baha Region | 1,434 GWh |
| Al-Jouf Region | 2,547 GWh |
| Northern Borders Region | 1,716 GWh |
2024 (1445–1446 AH) · GWh per year · General Authority for Statistics (GASTAT)
How much electricity does the commercial sector use in each region?
| Riyadh Region | 19,429 GWh |
|---|---|
| Makkah Region | 16,457 GWh |
| Madinah Region | 3,740 GWh |
| Eastern Province | 10,484 GWh |
| Qassim Region | 1,868 GWh |
| Asir Region | 1,795 GWh |
| Tabuk Region | 43 GWh |
| Hail Region | 834 GWh |
| Jazan Region | 1,911 GWh |
| Najran Region | 863 GWh |
| Al-Baha Region | 379 GWh |
| Al-Jouf Region | 551 GWh |
| Northern Borders Region | 431 GWh |
2024 (1445–1446 AH) · GWh per year · General Authority for Statistics (GASTAT)
How much electricity does the industrial sector use in each region?
| Riyadh Region | 7,387 GWh |
|---|---|
| Makkah Region | 7,892 GWh |
| Madinah Region | 8,266 GWh |
| Eastern Province | 36,641 GWh |
| Qassim Region | 1,044 GWh |
| Asir Region | 293 GWh |
| Tabuk Region | 99 GWh |
| Hail Region | 282 GWh |
| Jazan Region | 1,407 GWh |
| Najran Region | 28 GWh |
| Al-Baha Region | 21 GWh |
| Al-Jouf Region | 41 GWh |
| Northern Borders Region | 27 GWh |
2024 (1445–1446 AH) · GWh per year · General Authority for Statistics (GASTAT)
How much electricity does the government sector use in each region?
| Riyadh Region | 11,279 GWh |
|---|---|
| Makkah Region | 8,002 GWh |
| Madinah Region | 2,168 GWh |
| Eastern Province | 5,605 GWh |
| Qassim Region | 1,876 GWh |
| Asir Region | 1,880 GWh |
| Tabuk Region | 1,049 GWh |
| Hail Region | 995 GWh |
| Jazan Region | 2,261 GWh |
| Najran Region | 872 GWh |
| Al-Baha Region | 388 GWh |
| Al-Jouf Region | 703 GWh |
| Northern Borders Region | 442 GWh |
2024 (1445–1446 AH) · GWh per year · General Authority for Statistics (GASTAT)
Energy and water at home
What share of homes use kerosene?
1.1%
2024 (1445–1446 AH) · of dwellings · General Authority for Statistics (GASTAT)
What share of homes get electricity from the public grid?
99.9%
2024 (1445–1446 AH) · of dwellings · General Authority for Statistics (GASTAT)
What share of households want solar power at home?
40.8%
2024 (1445–1446 AH) · of households · General Authority for Statistics (GASTAT)
What share of households care about saving electricity?
91.5%
2024 (1445–1446 AH) · of households · General Authority for Statistics (GASTAT)
What share of homes use cooking gas in each region?
| Saudi Arabia | 86.6% |
|---|---|
| Riyadh Region | 88.0% |
| Makkah Region | 90.9% |
| Madinah Region | 91.1% |
| Eastern Province | 65.2% |
| Qassim Region | 97.3% |
| Asir Region | 91.4% |
| Tabuk Region | 89.9% |
| Hail Region | 89.2% |
| Jazan Region | 98.6% |
| Najran Region | 92.4% |
| Al-Baha Region | 88.9% |
| Al-Jouf Region | 96.9% |
| Northern Borders Region | 92.5% |
2024 (1445–1446 AH) · of dwellings · General Authority for Statistics (GASTAT)
What share of homes have thermal insulation in each region?
| Saudi Arabia | 45.8% |
|---|---|
| Riyadh Region | 43.1% |
| Makkah Region | 47.3% |
| Madinah Region | 49.9% |
| Eastern Province | 53.3% |
| Qassim Region | 54.7% |
| Asir Region | 29.3% |
| Tabuk Region | 41.5% |
| Hail Region | 39.5% |
| Jazan Region | 37.6% |
| Najran Region | 58.9% |
| Al-Baha Region | 40.1% |
| Al-Jouf Region | 35.7% |
| Northern Borders Region | 48.8% |
2024 (1445–1446 AH) · of dwellings · General Authority for Statistics (GASTAT)
What share of homes drink mainly from bottled water in each region?
| Saudi Arabia | 47.3% |
|---|---|
| Riyadh Region | 48.2% |
| Makkah Region | 42.3% |
| Madinah Region | 44.6% |
| Eastern Province | 61.7% |
| Qassim Region | 26.4% |
| Asir Region | 39.8% |
| Tabuk Region | 48.0% |
| Hail Region | 5.8% |
| Jazan Region | 92.2% |
| Najran Region | 47.3% |
| Al-Baha Region | 74.4% |
| Al-Jouf Region | 9.3% |
| Northern Borders Region | 6.1% |
2024 (1445–1446 AH) · main drinking-water source · General Authority for Statistics (GASTAT)
What share of homes drink mainly from the public network in each region?
| Saudi Arabia | 36.5% |
|---|---|
| Riyadh Region | 45.9% |
| Makkah Region | 30.6% |
| Madinah Region | 45.0% |
| Eastern Province | 30.2% |
| Qassim Region | 51.8% |
| Asir Region | 25.8% |
| Tabuk Region | 47.2% |
| Hail Region | 71.6% |
| Jazan Region | 1.7% |
| Najran Region | 17.7% |
| Al-Baha Region | 24.1% |
| Al-Jouf Region | 41.4% |
| Northern Borders Region | 59.8% |
2024 (1445–1446 AH) · main drinking-water source · General Authority for Statistics (GASTAT)
What share of homes drink mainly from water tankers in each region?
| Saudi Arabia | 15.8% |
|---|---|
| Riyadh Region | 5.6% |
| Makkah Region | 26.9% |
| Madinah Region | 9.7% |
| Eastern Province | 7.9% |
| Qassim Region | 21.5% |
| Asir Region | 33.2% |
| Tabuk Region | 4.4% |
| Hail Region | 22.2% |
| Jazan Region | 6.1% |
| Najran Region | 34.8% |
| Al-Baha Region | 1.2% |
| Al-Jouf Region | 49.3% |
| Northern Borders Region | 34.0% |
2024 (1445–1446 AH) · main drinking-water source · General Authority for Statistics (GASTAT)
What share of the population has safely managed drinking water?
99.86%
2024 (1445–1446 AH) · of the population · General Authority for Statistics (GASTAT)
What share of the rural population has safely managed drinking water?
98.86%
2024 (1445–1446 AH) · of the population · General Authority for Statistics (GASTAT)
What share of the population has at least basic drinking water?
99.98%
2024 (1445–1446 AH) · of the population · General Authority for Statistics (GASTAT)